ADDING LIGHT, CUTTING COSTS, RAISING STANDARDS - FMS UK GROUP DELIVERS LIGHTING OVERHAUL SOLUTION

Tosca approached FMS UK Group with a clear objective: to raise lighting levels in their operational warehouse while reducing long-term energy usage and ongoing maintenance costs. Their existing high bay lighting system was outdated, inefficient, and costly to run, posing challenges in both operational performance and energy compliance.

Our Solution

After an initial site assessment, our engineering team identified key areas where light levels were underperforming and energy consumption was excessive. We proposed a full like-for-like replacement of 35 existing fittings, along with the installation of 1 additional unit to optimise overall coverage.

The chosen solution: 150W UFO-style LED high bay fittings, known for their superior brightness, energy efficiency, and reliability in industrial settings.

Work Delivered

Our end-to-end service included

Assessment & Planning

  • Full survey of existing lighting levels

  • Health & safety review of working at height areas

  • Access planning using Mobile Elevated Work Platforms (MEWPs)

Supply of Materials

  • 36x 150W UFO LED high bay fittings

  • All associated cabling, fixtures, and installation components

Installation

  • Safe removal of outdated fittings

  • Like-for-like replacement across all 35 original locations

  • Additional LED fitting installed in a previously under-lit zone

  • Works carried out with minimal disruption to Tosca’s operations

Testing & Commissioning

  • Full post-installation inspection and lighting level tests

  • Certification of electrical safety and compliance

  • Final walkthrough with the client to ensure satisfaction

Results & Benefits
  • Significantly improved lighting levels throughout the warehouse, creating a brighter, safer and more productive working environment.
  • Substantial energy cost savings, thanks to reduced wattage per unit and long-lasting LED technology.
  • Lower maintenance requirements, eliminating the frequent replacement of traditional bulbs.
  • Full compliance with relevant lighting and workplace health & safety regulations.
  • Delivered as a complete turnkey solution – from planning to testing.
Why FMS UK Group?

At FMS UK Group, we understand the operational demands of warehousing and logistics environments. Our team delivered this project on time, safely, and with zero disruption to Tosca’s daily activities.

Whether you’re looking to improve lighting, reduce energy costs or meet regulatory standards, we provide tailored facilities management solutions that make your business run better—now and into the future.

If you would like to know more or have a similar project you need help on then please contact us.

MORE RECENT PROJECTS

RESTORING SAFETY AND STRUCTURE: FMS DELIVERS MAJOR ROOFLINE WORKS AT HEARSALL ACADEMY

For schools, colleges, and educational facilities, the summer holiday period presents a valuable…

Read More


RESTORING SAFETY AND STRUCTURE: FMS DELIVERS MAJOR ROOFLINE WORKS AT HEARSALL ACADEMY

FMS UK Group recently completed a comprehensive refurbishment project for Locale, a vibrant…

Read More


TRANSFORMING LOCALE – A TURNKEY RESTAURANT REFURBISHMENT BY FMS UK GROUP

FMS UK Group recently completed a comprehensive refurbishment project for Locale, a vibrant…

Read More


SPLITTING THE WORKSHOP TO ENSURE AN EASY RELOCATION AT THE BELFRY

The Belfry Golf club are currently undergoing a major refurbishment plan across the site, as an…

Read More


CALL US DIRECT - 024 7699 3199

Unit 12, Herald Business Park
Golden Acres Ln
Binley Industrial Estate
Coventry
CV3 2SY

GET IN TOUCH

Privacy Preference Center